Mostly, this will be above road medians to allow traffic flow underneath, with stations also elevated. All of line 6, save for the depot and some of its accompanying LRT, will be elevated above current roads. Line 6 consists of 16 elevated stations of 180m length each, and 20.1 km (12.5 mi) of electricity-powered light rail tracks. The line's train made its longest trial run on 12 December 2021. It successfully made its second run on 29 November 2021. It traveled from Diabari Depot to Mirpur 12. MRT Line-6's train made its first run on 29 August 2021. It was confirmed that 24 vehicles would run on the MRT Line-6. In 2014, it was reported that 56 trains would run on the metro system. It was later confirmed to be an elevated and underground metro rail project. The project was originally reported to be a 27 km (17 mi) underground metro rail line. It was planned to have 16 stations originally but it has been increased to 17 stations. The first route, originally projected to start from Uttara, a northern area of Dhaka, to Sayedabad, in the south of the capital, was eventually extended north to Uttara and truncated south to Motijheel. Originally, the project cost was Tk 21,985 crore but it was later increased by Tk 11,487 to Tk 33,472 crore. The main reason for the delays from 2020 to 2022 was the COVID-19 pandemic. Eventually, these dates were pushed back, with phase one opening in 2022 and phase two expected in 2023. In 2018, the second phase was expected to be complete by December 2020. By 2018, this expectation was still held to, but by 2019, completion of phase one was delayed to December 2021. ![]() When construction started in 2016, opening was expected by the end of 2019. Ĭonstruction work was divided into eight packages, covering aspects like depots, stations and rolling stock. JV, and a Tokyo-based construction company developed the depot's land. Civil engineering work was done by the Italian-Thai Development Public Company Ltd. Construction began on 26 June 2016 with an inauguration ceremony presided over by the prime minister Sheikh Hasina. The deal for construction of the MRT Line-6, costing US$2.8 billion, was signed by the Government of Bangladesh with the Japan International Cooperation Agency on 20 February 2013. In June 2013, Dhaka Mass Transit Company Limited (DMTC) was established by the Government to implement the Metro Rail Lines across the city. The General Consultant (GC), namely the NKDM Association, commenced work beginning in February 2014. A loan agreement between the Bangladeshi government and JICA was signed in January 2013.ĭhaka Mass Transit Company Limited (DMTC), the agency responsible for the implementation of the first metro line (MRT Line-6) was formed in January 2013. ![]() In 2012, the Government's Executive Committee of National Economic Council (ECNEC) approved the project. In an effort to implement Dhaka's 20-year-long Strategic Transport Plan (STP), the Government of Bangladesh invited the Japan International Cooperation Agency (JICA) to conduct a primary survey and feasibility study on the transport system of Dhaka in 2009–2010. Of these, two are under construction, with the rest still in the planning stages. The network is planned to contain six lines. The third phase will contain an additional 1.16 km extension at Kamalapur railway station which will have an interchange with MRT Line 1, MRT Lines 2 and 4 are set to be completed by 2025. ![]() The construction of MRT Line 6's second phase is scheduled to be completed by 2023. The first phase of Dhaka Metro's MRT Line 6 commenced commercial operations on 28 December 2022, after being inaugurated by Prime Minister Sheikh Hasina, with metro services being available to general commuters the next day. It is part of the Strategic Transport Plan (STP) outlined by the Dhaka Transport Coordination Authority. Together with the city's proposed subway system, it is expected to reduce traffic congestion in the city. The Dhaka Metro Rail ( Bengali: ঢাকা মেট্রোরেল), is a rapid transit system owned and operated by Dhaka Mass Transit Company Limited, it serves Dhaka, the capital city of Bangladesh. Probashi Kallyan Bhaban, Old Elephant Road, Dhaka ĭhaka Mass Transit Company Limited (DMTCL)
0 Comments
Leave a Reply. |